If it's not in the ticket, it didn't happen.
Engineering culture says 'write it down' — but half of what's agreed in planning, architecture reviews and post-mortems never reaches a ticket. Loopion captures commitments at the moment they're spoken, pushes them into your tooling, and keeps them visible until they ship.
Sound familiar?
Post-mortem action items have a half-life of one sprint
Architecture decisions live in someone's head until that someone leaves
"We should fix that properly later" — later never gets scheduled
Cross-team dependencies agreed verbally, dropped silently
Sprint planning commitments drift from what was actually said
The same tech-debt conversation happens every quarter, verbatim
A meeting you'll recognise
Loopion sits in the meeting as a visible participant, listens for commitments and turns them into owned, dated actions — before anyone opens a notes doc.
SRE (Kofi): Root cause: connection-pool exhaustion under the retry storm. Alerting caught it 22 minutes late.
Eng lead (Mira): I'll own the retry back-off change — PR this sprint. Kofi, can you take the alert threshold review by Wednesday?
Kofi: Yes — and we agreed the pool metrics need a dashboard. Dev, that's yours?
Dev: Mine. Dashboard live by end of sprint.
What Loopion captured
Implement retry back-off change (PR)
Mira · This sprint · Outstanding
Review alert thresholds for pool exhaustion
Kofi · Wednesday · Outstanding
Ship connection-pool metrics dashboard
Dev · End of sprint · Outstanding
Illustrative product example.
This is where other tools stop. Loopion keeps going.
Actions become tickets
Via Zapier, each captured action can create a Jira issue — post-mortem output reaches the backlog without a scribe.
The decision is on record
Why the back-off change was chosen — with who said what — is searchable long after the incident channel is archived.
Next post-mortem checks the last one
Recurring incidents surface whether previous corrective actions were actually completed. Uncomfortable — and useful.
Cross-team dependencies stay lit
Commitments made between teams carry owners and ages that both teams can see.
Questions your team can finally answer instantly
Which post-mortem actions from the last quarter are still open?
What did we decide about the retry strategy, and why?
Who owns the alerting review, and what's its status?
What tech-debt items have we agreed and never scheduled?
What did we commit to the platform team this month?
What changed between the last two architecture reviews?
Plays well with your stack
Jira (via Zapier)
Captured actions become issues in the right project automatically.
Slack (via Zapier)
Overdue corrective actions flagged in the team channel.
Webhooks
Raw action events into your own tooling — build whatever workflow you want.
Microsoft Teams / Zoom
Loopion attends planning, reviews and post-mortems as a visible participant.
What changes with the loop in place
Post-mortem actions ship before the sequel incident
Decision context survives team changes and channel archives
Verbal cross-team commitments become visible, aged and owned
The backlog reflects what was actually agreed in the room
Close the loop between the meeting and main
14-day money-back guarantee · Cancel anytime